My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. CCSR-HRSR 09-04-2012 SPEC JOINT (2)
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
09-04-2012 JOINT
>
3. CCSR-HRSR 09-04-2012 SPEC JOINT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2012 12:32:51 PM
Creation date
9/4/2012 1:53:56 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
9/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • • <br /> 1988-Elk River Riverwalk Project • Develop design standards for signage, facade <br /> Prepared by Brauer&Associates Ltd. improvements,interior improvements and new <br /> The report created a riverwalk design and outlined the financial construction. <br /> feasibility for a new building on the former Hardware store site at • Develop activities and events (e.g. Heritage festival, <br /> the south intersection of Jackson Avenue and Main Street. winter festival,mural event) <br /> • Conduct a market analysis to assist business recruitment <br /> Primary objectives included: <br /> • Create more retail/service traffic via a restaurant <br /> • Generate more interest in the Mississippi River via a <br /> boardwalk trail •' ' <br /> 0 R{ <br /> w <br /> • Develop design standards for rehabilitation and new a P+ ; e., • ; <br /> construction .�_ - '''' - ' , �- , ,� J. i` `4 ,• <br /> 1994-Mississippi Riverwalk Pathways Plan O a ter__.._ u <br /> r <br /> Prepared by Hoisington-Koegler Group, Inc. n - ti,6.41t,e. u !� .._. <br /> a _ <br /> The planning process utilized a local committee to establish a - ` ..- _'-- <br /> vision and cost estimate for developing the riverwalk. ,-f�^ 16 I ° "" <br /> 1988 <br /> Primary objectives included: <br /> • Create an interpretive walking/biking trail along the river , <br /> that depicts the early transportation history of the region I "- l au <br /> 1998-Central Business District Action Plan i, . <br /> a f <br /> c•� � any .y>.4I ' ==��C.., <br /> Prepared by Theresa Washburn , a�>>�, , „ __ <br /> The plan created the foundation for developing a downtown .a ti ,. ,-1, a , » �' r: <br /> master plan, and completing activities through working i, s,. <br /> committees. ' rry� l�' '_t <br /> t <br /> Primary objectives included: _ <br /> • Utilize the river, an arts center,pedestrian pathways and a i <br /> r ae <br /> beautification plan o�' Riverfmnt Pathway along the Missi_sippi <br /> 1994 <br /> Draft as of September 4, 2012 -Part I, page 23 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.