My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.3. SR 06-29-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
06/29/1998 - SPECIAL
>
3.3. SR 06-29-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:12 AM
Creation date
10/15/2003 3:10:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/29/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />**Item #3.3.** <br /> <br /> <br />Howard R. Green Company <br />CONSULTING ENGINEERS <br /> <br />[MSF <br /> <br />OONSULTlNG ENGINEERS <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />June 15, 19.98 <br />File: 230321J (0071) <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />PO Box 490 <br />Elk River, MN 55330 <br /> <br />RE: BUSINESS CENTER DRIVE IMPROVEMENTS <br />CHANGE ORDER NO. 1 <br /> <br />Dear Mr. Klaers: <br /> <br />Enclosed is a change order for the Business Center Drive improvement project, currently <br />being constructed by Richard Knutson, Inc. The change order is in the amount of <br />$1,995.60 and covers two items. The first is the overtime charges of $1,485.00 for <br />installing the watermain and sanitary sewer on the west side of the Sherburne County <br />administration Building on Saturday. As we had discussed before, we asked the <br />Contractor to do this work on Saturday to minimize the disruption to the County activities <br />during the work week. The Contractor worked approximately 13.5 hours. The lump sum <br />charge of $1,485.00 is equivalent to $110.00 per hour for manpower overtime charges to <br />do this work on a Saturday. The second item is a change that was requested by Bryan <br />Adams to the street lighting. The original design had one photocell, which controlled all <br />of the lights. Mr. Adams asked that the lights be changed to have individual photocells <br />on each fixture. That change resulted in an increase of $510.60. The total of these two <br />is $1,995.60. <br /> <br />We have reviewed the costs submitted by Richard Knutson, Inc. for these two items and <br />would recommend approval by the City of Elk River. If you have any questions <br />regarding this issue, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />, q;;;;LJ#/~ <br />T;ry~7~;r~{;E. <br /> <br />T JM/st <br /> <br />O:\PROJ\230321 J\321-1207 .june.doc <br /> <br />1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.