Laserfiche WebLink
City Council Minutes Page 5 <br /> August 13,2012 <br /> 6.3 Ice Arena Renovation Options <br /> Ice Arena Manager Rich Czech introduced Tom Betti of 292 Design Group. Mr.Betti <br /> reviewed four options for renovation of the existing ice arena for the Council to consider,as <br /> follows: <br /> Option 1: Cost is approximately$4.2 million. Reflects current CIP—If roof leaks and <br /> dehumidification in Barn Rink are not addressed,life expectancy is projected for 9-12 years. <br /> Option 2: Cost is approximately$4.9 million (Initially$1.2 million;additional$3.7 million in <br /> 10 years to replace refrigeration system). Maintain essential systems;would buy time before <br /> major improvements must be made. Short term fix;does not address immediate or future <br /> needs. <br /> Option 3: Cost is approximately$6.9 million.Addresses repairs for long-term operations; <br /> foundation for future needs. Includes new roof,dehumidification;expansion of locker <br /> rooms in barn rink;enhanced lobby,replaces refrigeration in Olympic rink,which would <br /> accommodate barn rink in future to significantly improve arena's efficiency. <br /> Option 4: Cost is approximately$9.3 million. Replaces barn structure;adds new locker <br /> rooms; expands lobby to accommodate both rinks;team lockers replaced with larger <br /> updated rooms with improved air quality;new upper level lobby with concessions, storage, <br /> restrooms and meeting rooms;replacement and centralization of both ice plants and HVAC <br /> systems with state-of-the art equipment(address dehumidification). <br /> Discussion followed regarding: <br /> • History of original barn rink and the Olympic rink <br /> • What the city's role/responsibility is in financing the renovations <br /> • Costs of renovations <br /> • Commitment/responsibility of users (i.e. School District,skate groups,Youth <br /> Hockey) <br /> • Additional operating costs with the proposed renovations <br /> • Number of hours of ice time for city programming,and hours billable to other <br /> groups <br /> • Advantages of multi-use facility to generate income (field house,community rooms, <br /> meeting space for private and public organizations) <br /> • Possible financing scenario <br /> • Other possible sources of income generation (gate fees,concessions) <br /> • Option of tearing down barn rink,leaving the Olympic rink <br /> • Usage by the school district and their lack of interest in financial participation <br /> Mr. Czech stated that currently,enough revenue is generated to cover operating costs. <br /> Discussion followed regarding the need for a meeting with all stakeholders (users). Mayor <br /> Dietz asked that staff provide more information regarding costs,possible income generating <br /> options,and other costs associated with a renovation project(increased staff and utility <br /> costs). <br />