My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 09-04-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
09-04-2012
>
4.5. SR 09-04-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2012 10:36:00 AM
Creation date
8/31/2012 10:33:24 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> Elk =- <br /> River <br /> REQUEST FOR PROPOSALS <br /> 2013 STREET IMPROVEMENTS <br /> SECTION I: GENERAL INFORMATION <br /> Contract Administration <br /> All correspondence regarding this RFP and the proposed project must be addressed to: <br /> Justin Femrite <br /> City Engineer <br /> City of Elk River <br /> 13065 Orono Parkway <br /> Elk River,MN 55330 <br /> All persons or companies whom download this RFP are requested to register their name and <br /> email address by sending an email to jfemrite&elkrivermn.gov. Any revisions to or <br /> corrections on this RFP, after it has been advertised,will be communicated to those <br /> registered RFP holders. Failure to register your contact information as described is at your <br /> own risk. A proposal will not be considered if it fails to include all requested information as <br /> detailed in this original RFP and any subsequent modifications. <br /> Acceptance of Proposal Contents <br /> The contents of this RFP will be included as part of the contractual obligations if a contract <br /> ensues. All information in the proposal is subject to disclosure under the provisions of <br /> Minnesota Statutes Chapter 13—Minnesota Government Data Practices Act. <br /> PROJECT OVERVIEW <br /> The City of Elk River intends to retain a professional consulting firm to provide professional <br /> engineering services needed to successfully implement a project to rehabilitate a number of <br /> city streets and public utility systems in 2013. The proposed project areas are shown in the <br /> attached figure. Our project estimate, as include in the city capital improvement plan,is <br /> $2,800,000 for surface and storm sewer improvements. It is expected to replace some aged <br /> water main and sanitary sewer in the downtown area of work on Railroad Drive, 3rd Street, <br /> 4"' Street and Irving Avenue. These system modifications will be further reviewed by City <br /> staff and are to be incorporated into the Feasibility study and final project. <br /> There will also be a new water main installed along 185"'Avenue, as part of the surface <br /> improvements, to eliminate some existing dead end lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.