My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4. SR 08-20-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
08-20-2012
>
8.4. SR 08-20-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2012 3:22:23 PM
Creation date
8/17/2012 12:25:24 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�✓i <br /> C:itv ct REQUEST FOR ACTION <br /> El <br /> RiVer <br /> O ITEM NUMBER <br /> Ma or and City Council 8.4 <br /> AGENDA SECTION MEETING DATE PREPARED BY <br /> General Business August 20, 2012 Jeremy Barnhart,Planning Manager <br /> ITEM DESCRIPTION REVIEWED By <br /> Main Street and Highway 169 Entrance Signage Cal Portner, City Administrator <br /> REVIEWED BY <br /> ACTION REQUESTED <br /> Authorization to proceed with getting quotes for entrance signage at Highway 169 and Main Street similar <br /> in design to the attached sketch. The Council has the right to reject any and all quotes once received. <br /> BACKGROUND/DISCUSSION <br /> Preliminary concepts of the landscaping improvements at Main Street and Highway 169 include entrance <br /> signage in the northeast quadrant of the intersection. MnDOT has noted their strong opposition to rocks <br /> or boulders in the right of way. As the landscaping plans developed,it became apparent that an <br /> opportunity to install blocks on the former city property remained. Any signage would be located on top <br /> of the hill, out of the right of way. <br /> Staff proposes a sign using stones similar to those employed by the downtown seating benches and by the <br /> Rotary Club for park signs (most notably the River walk north of the Parish Avenue bridge). Attached to <br /> these stones would be aluminum, backlit letters. The back lighting would wash the stones in light,with <br /> the letters creating dark contrasts in the evening. <br /> The attached picture shows the stones spread out, due to space constraints, these spaces would be <br /> reduced or eliminated. Additionally, the letters would need to be sized and spaced to conform with the <br /> sign ordinance. <br /> FINANCIAL IMPACT <br /> The bench stones are approximately$1,000-1,500 each, and the signage is about$3,000. Electricity <br /> would need to be extended from the city property at a cost estimated at$3,000, totaling$19,500. <br /> Consistent with the landscaping improvements, funding would come from unspent portions of the Street <br /> Improvement Reserve. <br /> ATTACHMENTS <br /> ® Sign Sketch <br /> Action Motion by Second by Vote <br /> Follow Up <br /> P...a E0E0 9Y <br /> N:\Public Bodies\City Council\Council RCA\Agenda Packet\08-20-2012\Signage Memo.docs <br />
The URL can be used to link to this page
Your browser does not support the video tag.