Laserfiche WebLink
Option 4 (New Rlnk 1): <br />• New Rink 1, replace the barn <br />• New front lobby addition including team rooms, concessions, pro -shop, restrooms, managers office. <br />• New team rooms between the two rinks, including 2 varsity team rooms. <br />• Combined new refrigeration room for both rinks. <br />• New concrete rink floor for Rink 2. <br />• Add sprinklers over Rink 2 Ice arena floor surface. <br />• Repair Rink 2 dehumidification. <br />• New upper level lobby with concessions, restrooms, and storage. <br />• New upper level community meeting rooms and dryland training center. <br />• Upgrade IT and PA systems <br />Pros: <br />New common refrigeration system. <br />Operationally more efficient; combined ice resurfacer and refrigeration room <br />Regulation ice sheets for both rinks. <br />Better seating for Rink 1. <br />Concrete floor added to Rink 2, multi - purpose opportunities are possible and <br />and more efficient operation of ice plant. <br />More energy efficient facility; durable and energy efficient envelope for new <br />and dehumidification systems. <br />Facility will have a new identity because of addition and lobby expansion. <br />Larger lobby accommodates larger events. <br />ADA accessibility to upper level. <br />Upper lobby, meeting rooms, and dryland training is a benefit to more of Elk <br />Varsity Team rooms are addressed. <br />Cons: <br />Expense <br />Alternate: Reduce East Rink from Olympic size to NHL size <br />less maintenance <br />rink 1, efficient HVAC <br />Rivers citizens. <br />a <br />Z <br />W <br />a <br />W <br />V <br />W <br />Y <br />J <br />W <br />Q <br />0 <br />i <br />N <br />61 <br />N <br />