My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 08-13-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
08-13-2012
>
6.3. SR 08-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2012 10:18:28 AM
Creation date
8/10/2012 9:10:00 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ICE ARENA - ICE SYSTEM EVALUATION AND RECOMMENDATIONS <br />Estimated Project Costs <br />The proposed cost estimates presented throughout this report <br />were developed by estimating the probable construction costs <br />based on similar types of construction projects and work <br />performed and bid in 2008 -2012 and updated for 2013 costs <br />unless otherwise noted. The estimated costs include all <br />materials and labor for a complete installation unless otherwise <br />noted. Costs will vary depending on the time of year the <br />projects are bid, the current economic climate and the size of <br />project. <br />In addition to the probable construction costs of the proposed <br />work, other associated project costs are included to provide a <br />total estimate cost for the project. The Estimate, Design and <br />Construction Contingency line item in each cost table is included <br />during the evaluation phase of projects since the exact scope of <br />the project has not yet been determined. This percentage is <br />typically reduced from 15% to 5% during the final design phase <br />of the project. <br />The Engineering, Legal and Administrative line item in each cost <br />table is provided to cover all work performed by the design <br />team and all legal and administrative work required by the City <br />for projects of this type. <br />Applicable Codes and Standards <br />The following codes were considered during the evaluation: <br />• Minnesota State Building Code, 2007, including Chapter <br />1341 Accessibility Code <br />• International Building Code, 2006 <br />• 2007 Minnesota State Fire Code (International Fire Code, <br />2006) <br />• International Mechanical Code, 2006 <br />• 2009 Minnesota State Mechanical Code <br />• NFPA 70 (NEC), 2008 <br />• Department of Labor & Industry — High Pressure Piping and <br />Code for Power Piping Systems, Chapters 326 (MN Statues <br />1999) and Chapter 5230 (MN Rules 2001) <br />• ANSI /ASHRAE Standard 15 -2007 <br />• The City's CODE OF ORDINANCES were not reviewed or <br />referenced for this evaluation. <br />c Stevens <br />
The URL can be used to link to this page
Your browser does not support the video tag.