My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 08-13-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
08-13-2012
>
6.3. SR 08-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2012 10:18:28 AM
Creation date
8/10/2012 9:10:00 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roof Executive Summary: <br />Roof Area D & E consists of metal panels with insulation boards adhered to the underside and spray coated <br />installed in 1971 (Area D) and 1997 (Area E). The metal roofs are in good physical condition with small <br />areas of minor surface rust. A few of these areas have been painted. We believe that the existing metal roofs <br />can last another 15 -20 years with recommended permanent repairs and do not have to be replaced. <br />We also observed mechanical saw cuts all the <br />way through the metal panel at one location on <br />roof Area E. <br />Deteriorated sealant was observed at the <br />roof /wall transition at roof Area E. <br />Roof Executive Summary: <br />Roof Area D & E consists of metal panels with insulation boards adhered to the underside and spray coated <br />installed in 1971 (Area D) and 1997 (Area E). The metal roofs are in good physical condition with small <br />areas of minor surface rust. A few of these areas have been painted. We believe that the existing metal roofs <br />can last another 15 -20 years with recommended permanent repairs and do not have to be replaced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.