Laserfiche WebLink
Street Maintenance <br />2013 Goals <br />Eliminate the need for total street reconstruction with proper maintenance <br />techniques. <br />® Inspection of all street signs completed and all signs with substandard reflectivity are <br />scheduled to be replaced in 2012. <br />® Inspect 20% of the City's storm drainage system and make any necessary repairs. <br />