Laserfiche WebLink
Energy Efficiency Improvement Program <br /> Purpose: The Energy Efficiency Improvements Program is available to <br /> property owners of commercial or industrial buildings in Elk River to <br /> provide capital to businesses to invest in energy efficiency and <br /> improve their profitability through reduced energy costs and enhance <br /> their ability to retain and create jobs. In addition,the program helps <br /> the City of Elk River use energy conservation as an economic <br /> development tool. <br /> Amount: Applicants may apply for the cost of improvements up to$74,999 <br /> Eligible Uses: Energy efficiency measures installed in or on a building include: <br /> • Facility systems optimization (commissioning/re-commissioning) <br /> • Facility systems control improvements <br /> • Process efficiency improvements (CenterPoint Energy) <br /> • lighting efficiency improvements <br /> • Heating,ventilation and air conditioning system modifications <br /> • Exterior envelope improvements <br /> • Motor and pump efficiency improvements <br /> • Ground-source heat pump systems used to heat or cool a facility <br /> • Installation of equipment or devices that use renewable energy <br /> sources to generate electricity or heat or cool a building including <br /> solar electricity(photovoltaic),wind turbine or solar thermal. <br /> Equity: Must have a minimum of 10%equity provided by the borrower. <br /> Rate: Fixed;2 points below the lowest prime rate published in the Wall S <br /> treet Journal the day the loan is closed, or 3%,whichever is greater. <br /> Term: The maximum maturity date will be determined by the useful life of <br /> the improvement and the energy payback achieved. For projects that <br /> have a shorter length of payback (2-5) years as calculated according <br /> to energy savings,the loans will have an initial maturity of up to 5 <br /> years from the date of closing. Longer life improvements (6-15 <br /> years) may apply for a longer maturity of up to 10 years. <br /> Criteria: Applicant must agree to energy audits conducted under the utility <br /> company's Conservation Improvement Program (CIP). If warranted, <br /> engineering studies then are performed on facilities with conservation <br /> opportunities under the utility company's CIP Program. <br /> Proposed energy efficiency improvements that do not qualify for the <br /> utility's prescriptive rebate program will be reviewed and approved by <br /> the utility company servicing the upgrade measures (e.g. Elk River <br /> Municipal Utilities,Connexus,CenterPoint) along with a letter <br /> indicating eligible utility rebates. <br /> Micro Loan Fund Policy&Guidelines Page 4 of 15 <br /> Amended May 2011 <br />