My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.4. SR 08-06-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
08-06-2012
>
10.4. SR 08-06-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 2:06:46 PM
Creation date
8/3/2012 1:34:57 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Long term <br />1. Ability to either acquire or provide technology /IT services to or from others: <br />a. An example would be for us to share in the county phone system (we currently have <br />identified $150k to replace our system in 2014) <br />b. We could provide services to either the county or the school district <br />c. We could jointly purchase and implement technology <br />2. Ability to connect in to school district fiber network <br />3. Ability to provide video conferencing to off campus locations <br />4. Ability to video conference between city and county Emergency Operation Centers <br />5. Ability to provide backup facilities with the county <br />6. Ability to grow the network to touch other city facilities like substations <br />Michel's is obligated to start the project by August 16. If the Council is interested, staff would work <br />immediately on: <br />• Assurance of significant cost savings of doing it now, comparison to State contract pricing <br />• A 3 -way cost sharing Memorandum of Understanding <br />FINANCIAL IMPACT <br />The anticipated total cost shared by the three entities for the entire 8 mile fiber loop is $233,033.47 plus <br />$8,000 engineering for a total of $241,033.47. After the initial loop each location connection would be <br />$2,000. The city share could be split between the Liquor and Wastewater Enterprise Funds. <br />ATTACHMENTS <br />■ Map of the proposed fiber loop <br />■ 2012 -2016 Capital Improvement Plan (Page 69) <br />Action Motion by Second by Vote <br />Follow Up <br />N:APublic Bodies \City Council \Council RCA \Agenda Packet \08 -06- 2012 \Fiber Staff Report.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.