My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 07-17-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2012
>
07-17-2012
>
6.1. ERMUSR 07-17-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2013 11:51:39 AM
Creation date
8/1/2012 11:16:28 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River ~� <br /> Municipal Utilities <br /> 13069 Orono Parkway <br /> P.O. Box 430 <br /> Elk River,MN 55330 <br /> (763) 441-2020 <br /> UTILITIES COMMISSION MEETING <br /> FROM: <br /> TO: David Berg—Water Superintendent <br /> Elk River Municipal Utilities Commission <br /> John Dietz, Chair <br /> Daryl Thompson,Vice Chair <br /> Allan Nadeau,Trustee <br /> AGENDA ITEM NUMBER: <br /> MEETING DATE: 6.1 <br /> July 17, 2012 <br /> SUBJECT: <br /> Staff Update <br /> • DISCUSSION: rotection program for the safety of our <br /> Elk River Municipal Utilities has started a backflo lace for a number of years,the Minnesota <br /> customers. Although the regulations <br /> DH)has recently o verify that public water suppliers have a <br /> Department of Health (MDH) number of them to be sure they <br /> We have several locations that have never been checked. Elk River Municipal <br /> program m place. good <br /> n <br /> Utilities does have a program,but we will need to inspect a g prevention have <br /> are u to date with backflow checks and that locations <br /> department require and ERMU water department o <br /> P <br /> something installed to meet code. The City building s ould be i inspections. al our <br /> ether to identify potential locations where RP� eshould be installed and to also <br /> are working tog <br /> communicate with water users so that we have verification o <br /> we will be following the rules set by the Minnesota Department of Health. <br /> joint efforts, <br /> anies to get bids,this <br /> looking at fully resurfacing the Freeport Tower. f e a engineering companies year' <br /> We are g <br /> since it was built. Currently we are talking 0113.o This project should cost somewhere between <br /> way we may start the process by April skirting and paint. <br /> $700,000 to $900,000 for sandblasting, <br /> P wEe URE <br /> • <br /> RRA3 POWERED TO SERVE <br /> 0 <br /> powelov d Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.