My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 05-11-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
05/11/1998 - SPECIAL/JOINT
>
7.1. SR 05-11-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:10 AM
Creation date
10/1/2003 2:58:59 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/11/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1998 Police Computer Needs <br />Elk River Police Department <br /> <br />SUMMARY: The police department has presented a request to the council for <br />funding to upgrade the police computer system. This request is based on a need <br />to make the computer year 2000 ready, allow addition of mobile data computers <br />to squad cars, and upgrade a system which was installed in 1984 and has <br />become vastly outdated. The current system is not year 2000 upgradeable and is <br />actually beyond its current capacity now. <br /> <br />TI:ME LZNE: To define the exact schedule which we would follow requires <br />defining the stages from start to finish. <br /> <br />ZMMEDTATE: <br /> <br />Upgrade all current computers to Window's 95 speed. <br />We have "dumb terminals" which will not function on <br />a local area network as well as older model <br />computers, which will just need to be upgraded. <br />This needs to be done so that the server and LAN <br />bids can be done correctly. The bids will be done by <br />inviting system engineers to our location to inspect <br />the personal computers as well as the physical plant <br />for cable needs. The brand of computer as well as <br />what it contains as far as sound cards, modems and <br />other hardware may affect the installation of the LAN. <br />]:f we wait and buy the computers alter we request <br />LAN bids we may suffer through hardware conflicts. <br />City Hall had to remove sound cards and other <br />hardware due to server/LAN conflicts. We can avoid <br />this pitfall and expense if we are properly prepared <br />for the bid process so the. engineers can specify the <br />design requirements prior to installation. The sooner <br />we can get the PC's in, the sooner we can start the <br />bid process. <br /> <br />SECONDARY: <br /> <br />Alter the PC's have arrived, we can contact <br />companies for requests for bids on the server and <br />local area network. This could take anywhere from <br />1 - 2 months, l~f we start by purchasing PC's now and <br />putting out requests for bids next week, we would not <br />actually have a network installed until late .luly or the <br />first of August. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.