My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.5. SR 06-18-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
06-18-2012
>
7.5. SR 06-18-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 10:37:48 AM
Creation date
6/15/2012 8:33:07 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F ~ ~ Y' <br />II r _ <br />~.~/ ~~ <br /><, <br />June 4, 2012 <br />Mr. Jeremy Barnhart, AICP <br />Planning Manager <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />ENGINEERS ^ SURVEYORS ^ PLANNERS <br />LANDSCAPE ARCHITECTS ^ ENVIRONMENTAL SCIENTISTS <br />2277 West Highway 36, Suite 200 <br />Roseville, MN 55113 <br />(651)697-0800 Fax (651}697-0804 <br />www.ceieng.com <br />RE: 27128.0 - AutoZone, Zane St., NW <br />Site Plan Submiftal <br />Dear Jeremy: <br />Thank you for your review of the referenced project. We offer the following responses to your <br />comments: <br />Timetable: <br />1. This project will require a public hearing of the site plan. These hearings are anticipated <br />for June 92th (Planning Commission) and June 98th (City Council). Both meetings start <br />at 6:30 PM and are held at the Elk River City Hall. You or an agent must attend these <br />meetings.. <br />Response: We acknowledge the public hearing requirements for both Planning <br />Commission and City Council, and will attend both meetings. <br />Building Inspection: <br />2. Site Plan approval merely gives the City the ability to issue a building permit. Please <br />correspond with Bob Ruprecht, Building Official for the building permit. He can be <br />reached at (763)635-9066. <br />Response: We will contact Mr. Ruprecht for Building Permit processing. <br />Engineering: <br />3. The City Engineer has reviewed the drawings and has suggested the following changes, <br />based on the sheet: <br />a. Page C3 -Storm Manhole #1 shall be detailed and constructed per Elk River <br />Standard Plate #4009. <br />Response: The requested Standard Plate has been added to the plans on <br />Detail Sheet C10. <br />Providing Conso/idated Land Qevelopment Services <br />CALIFQRN(A ^ TEXAS s ARKANSAS ^ MINNESOTA s GEORGIA d PENNSYLVANIA <br />
The URL can be used to link to this page
Your browser does not support the video tag.