Laserfiche WebLink
F ~ ~ Y' <br />II r _ <br />~.~/ ~~ <br /><, <br />June 4, 2012 <br />Mr. Jeremy Barnhart, AICP <br />Planning Manager <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />ENGINEERS ^ SURVEYORS ^ PLANNERS <br />LANDSCAPE ARCHITECTS ^ ENVIRONMENTAL SCIENTISTS <br />2277 West Highway 36, Suite 200 <br />Roseville, MN 55113 <br />(651)697-0800 Fax (651}697-0804 <br />www.ceieng.com <br />RE: 27128.0 - AutoZone, Zane St., NW <br />Site Plan Submiftal <br />Dear Jeremy: <br />Thank you for your review of the referenced project. We offer the following responses to your <br />comments: <br />Timetable: <br />1. This project will require a public hearing of the site plan. These hearings are anticipated <br />for June 92th (Planning Commission) and June 98th (City Council). Both meetings start <br />at 6:30 PM and are held at the Elk River City Hall. You or an agent must attend these <br />meetings.. <br />Response: We acknowledge the public hearing requirements for both Planning <br />Commission and City Council, and will attend both meetings. <br />Building Inspection: <br />2. Site Plan approval merely gives the City the ability to issue a building permit. Please <br />correspond with Bob Ruprecht, Building Official for the building permit. He can be <br />reached at (763)635-9066. <br />Response: We will contact Mr. Ruprecht for Building Permit processing. <br />Engineering: <br />3. The City Engineer has reviewed the drawings and has suggested the following changes, <br />based on the sheet: <br />a. Page C3 -Storm Manhole #1 shall be detailed and constructed per Elk River <br />Standard Plate #4009. <br />Response: The requested Standard Plate has been added to the plans on <br />Detail Sheet C10. <br />Providing Conso/idated Land Qevelopment Services <br />CALIFQRN(A ^ TEXAS s ARKANSAS ^ MINNESOTA s GEORGIA d PENNSYLVANIA <br />