Laserfiche WebLink
The city is proposing to direct the flow of the Elk River through Lake Orono away from <br />the construction activities. The specific of how this is accomplished will be reviewed and <br />approved by the DNR through their Protected Waters Permit. <br /> <br />With the proposed draw down of the lake, it is anticipated that individuals will request <br />permits for projects that fall below the Ordinary High Water mark. The DNR has <br />requested the city's assistance in compiling and coordinating these individual projects. <br /> <br />A study of the wetland inventory map and aerial photos, site visits, and discussions with <br />the property owners, do not reveal any wetlands on the sediment disposal sites. This will <br />be field verified as soon as conditions permit in the spring. Under no circumstance will <br />sediment be placed in a wetland. <br /> <br />CERTIFICATION BY THE RGU (all 3 certifications must be signed for EQB <br />acceptance of the EAW for publication of notice in the EQB Monitor_) <br /> <br />a. I hereby certify that the information contained in this document is accurate and complete to the best of <br />my knowledge~~ / <br /> <br />b. I hereby certify that the project described in this EAW is the complete project and there are no other <br /> projects, project stages, or project components, other than those described in this document, which are <br /> related to the project as "connected actions" or "phased actions," as defined, respectively, at Minn. <br /> Rules, pts.~bp. <br /> <br />c. I hereby certify that copies of the completed EAW are being sent to all points on the official EQB <br />Si na r.W_ <br />Title of signer ~' <br /> e ' Date <br /> <br /> <br />