My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 04-20-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
04/20/1998
>
6.4. SR 04-20-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:09 AM
Creation date
9/30/2003 3:06:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/20/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. Water Surface Use Will the project change the number or type of watercraft on any water body? <br /> Yes x No <br />If yes, indicate the current and projected watercraft usage and discuss any potential overcrowding or <br />conflicts with other users or fish and wildlife resources. <br /> <br />It is not anticipated that as a result of the project the number of watercraft on Lake Orono <br />will increase. However the project will increase the useable area of the lake dispersing <br />the existing use. <br /> <br />16. Soils Approximate depth (in feet) to: <br />Ground water: minimum~ average__ Bedrock: minimum__ average__ <br />Describe the soils on the site, giving SCS classifications, if known. (SCS interpretations and soil boring <br />logs need no.._3t be attached.) <br /> <br />Disposal sites <br />Ground water: The minimum and average depth to ground water at the disposal site is <br />greater than 6 feet. <br />Bedrock: minimum 60 feet average 70 feet. <br />Soil classifications: The majority of the soil at these sites have SCS Soil classifications <br />of Hubbard loamy sand and Sandberg loamy coarse sand. <br /> <br />Lake <br />Ground water: The depth to ground water currently is 0 because it is a lake. When the <br />lake is drawn down the depth of ground water will be the elevation of the river or <br />probably lower. No signs of ground water seepage into the lake were observed during <br />past draw downs. <br />Bedrock: minimum 50 feet average 60 feet <br />Soil classifications: No SCS classification exist for lake bottom, but the predominate <br />engineering soil classifications are clayey sand with organic clay (SC - SM/SM) and sand <br />with silt (SP-SM). <br /> <br />17. Erosion and Sedimentation Give the acreage to be graded or excavated and the cubic yards of <br />soil to be moved: acres __61.9 ; cubic yards _115,000_ <br />Describe any steep slopes or highly erodible soils and identify them on the site map. <br />Describe the erosion and sedimentation measures to be used during and after construction of the project. <br /> <br />No steep slopes are associated with the project on the lake or disposal sites before or after <br />the construction. The lake bottom in the locations of the proposed work is made up of <br />mainly sand and is unlikely to be agitated into suspension. No flushing of sediment was <br />observed during past draw downs of the lake. Best management practices will be adhered <br />to, the details of which are incorporated into the construction plans. <br /> <br />18. Water Quality - Surface Water Runoff <br /> <br />a. Compare the quantity and quality of the site runoff befire and after the project. Describe methods to <br />be used to manage and/or treat runoff. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.