My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.0-9.0. ICESR 04-17-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2012
>
04-17-2012
>
5.0-9.0. ICESR 04-17-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2012 8:14:30 AM
Creation date
4/19/2012 9:36:35 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Leak Investigation: <br />After performing a visual inspection of the roof, we performed leak investigations at multiple locations to <br />determine the cause of water infiltration into the locker rooms and hallways between the two ice arena <br />buildings. The majority of leakage was occurring on the North wall of the newer Ice Arena Building. The <br />following is a summary of our observations and findings: <br />~} <br />.f <br />~; <br />I', <br />Y <br />,~~ -~. <br />.. <br />;k: <br />4 ~ ... <br />.., <br />19 <br />The newer Ice Arena Building consists of <br />precast concrete panels with vertical "fins" that <br />have a rough texture. <br />Vertical control joints with foam backer <br />materials were installed between the precast <br />concrete panels to allow for movement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.