Laserfiche WebLink
Leak Investigation: <br />After performing a visual inspection of the roof, we performed leak investigations at multiple locations to <br />determine the cause of water infiltration into the locker rooms and hallways between the two ice arena <br />buildings. The majority of leakage was occurring on the North wall of the newer Ice Arena Building. The <br />following is a summary of our observations and findings: <br />~} <br />.f <br />~; <br />I', <br />Y <br />,~~ -~. <br />.. <br />;k: <br />4 ~ ... <br />.., <br />19 <br />The newer Ice Arena Building consists of <br />precast concrete panels with vertical "fins" that <br />have a rough texture. <br />Vertical control joints with foam backer <br />materials were installed between the precast <br />concrete panels to allow for movement. <br />