Laserfiche WebLink
Item 6.15. <br /> <br />Howard R, Green Company <br />CONSULTING ENGINEERS <br /> <br />March 5, 1998 <br />File: 801210j-0030 <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />Mr. Pat Klaers <br />City of Elk River <br />13065 Orono Parkway <br />P. O. Box 490 <br />Elk River, MN 55330-0490 <br /> <br />RE: BOSTON STREET FEASIBILITY STUDY <br /> <br />Dear Mr. Klaers: <br /> <br />As directed by the City Council at their last regularly scheduled meeting, I have revised the <br />assessment portion of the Boston Street Feasibility Study. As you are aware, the financing <br />section of the Feasibility Study recommends that two of the parcels be assessed two (2) units <br />each. The change I have made in the assessments is that the street for both of these units is <br />assessed immediately along with the sewer and water for one of the units. The sewer and <br />water for the second unit is proposed to be deferred. I have calculated the cost of this street <br />assessment per unit to be $4,500. Therefore, the deferral for each of these units for the sewer <br />and water results in $6,154 for a total of $12,300. This results in a total deferral for this <br />proposed project of approximately 26%%. <br /> <br />Attached are amended copies of the Feasibility Study and a Resolution for the City Council's <br />consideration. The Resolution will accept the Feasibility Study and order the public hearing for <br />this project. I have tentatively set the public hearing date as April 6, 1998. <br /> <br />If you have any questions regarding any of this information, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br />Terry J. ,rvl~urer, P.E. <br /> <br />TJM/et <br /> <br />Attachments <br /> <br />O:~proj\801210~ 10-2010.feb <br /> <br />1326 Energy Park Drive · St. Paul, MN 55108 ° 612/644-4389 fax 612/644-9446 toll free 888/368-4389 <br /> <br /> <br />