Laserfiche WebLink
Memo/Mayor and Council/P 97-15 <br />March 16, 1998 <br />Page 4 <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />THE FLOODWAY AND FLOOD FRINGE BE NOTED ON THE PLAT AND ALL <br />REQUIREMENTS OF THESE ORIDNANCES BE MET. <br /> <br />EROSION CONTROL SHALL BE PROVIDED ALONG THE BANK OF THE ELK RIVER. <br /> <br />THE DEVELOPER PROVIDE THE CITY SOME FORM OF SECURITY TO ENSURE THE <br />FRONTAGE ROAD IS REBUILT TO AN URBAN STANDARD. THE CITY ENGINEER SHALL <br />DETERMINE THE APPROPRIATE AMOUNT TO COVER THE COST OF THE STREET. <br /> <br />ALL LOTS ADJACENT TO THE ELK RIVER MUST HAVE THE ENTIRE YARD SODDED AT THE <br />TIME OF CERTIFICATE OF OCCUPANCY. <br /> <br />\\elkriver\sys\shrdoc\council\p97-15.doc <br /> <br /> <br />