My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-30-1998 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
1990-1999
>
1998
>
03-30-1998 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:07 AM
Creation date
9/29/2003 6:53:45 PM
Metadata
Fields
Template:
City Government
type
CCM
date
3/30/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River City Council Minutes Page 2 <br />March 30, 1998 <br /> <br />policies from urban counties, it is estimated that the city's contribution for the <br />trails, median, and curb and gutter would be significantly less and that the city <br />would be obligated for approximately $110,000 of the improvements. Even this <br />lower amount reflects a dramatic change from past practices in Sherburne <br />County. <br /> <br />Mayor Duitsman indicated that the City Council believes that the new county <br />policy is unfair as it relates to county roads in urban areas and that it needs to be <br />changed to address this situation. The Mayor further indicated that if there is not <br />a change in the county's policy for cost sharing on County Road 12, then this <br />project may have to be dropped. <br /> <br />No decision on cost sharing for County Road 12 was reached and the county <br />and city staffs were directed to work on an equable solution to this problem. <br /> <br />1 .b. County State Aid Hi,qhway # 1 <br /> <br />County Engineer Dave Schwarting provided an update on the completion <br />timetable for this project. Concerns were expressed regarding the County Road <br />I and County Road 77 intersection. <br /> <br />1.c. Community Based Planninq and County Transportation Plan <br /> <br />Dave Schwading provided an update on the adopted (March 10, 1998) County <br />Transportation Plan. This plan includes a bridge crossing over the Elk River near <br />the western boundary of the city and an east/west collector route from Highway <br />169 to County Road 1. <br /> <br />Commissioner Wergin provided an update on the existing law and proposed <br />legislation regarding community based planning. <br /> <br />1.d. County Roads 77 and 33 Reali,qnment <br /> <br />Dave Schwarting provided an update on the status of this project. It was noted <br />that the realignment is included in the County Transportation Plan and that the <br />gravel operators are hoping for construction activity in 1998 prior to their <br />relocation in 1999 out of this area and into another gravel pit in Elk River. An <br />important issue with this project is the relocation of NSP poles. A preliminary road <br />alignment needs to be accomplished soon and the staffs are planning to meet in <br />the next few weeks to work on this project. <br /> <br />1.e. Hi.qhway 10 and Upland Avenue Intersection <br /> <br />City Engineer Terry Maurer provided an update on this project which is scheduled <br />to be completed in 1998. It was noted that the north leg of this project is a <br />County Road and the south leg is a city street. Concern was expressed about <br />increased traffic on County Road 44 and improvements that may be necessary <br />to handle pedestrian traffic and a higher volume of vehicle traffic on this county <br />road. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.