Laserfiche WebLink
CQNSTR,UCTION <br />ESTIMATE DATE: February 15, 2012 <br />PROJECT: Elk River Public: Works <br />ARCHITECT: 292 Design Group <br />DRAWING DATE: January 9, 2012 <br />BASE BIDS RECEIV ED: Total Base Btd: $8,561,621 <br /> <br />ALTERNATES: ALTERNATES BID: ALTERNATES <br /> ACCEPTED: <br />No. 1: Install one vehicle lift type'1' in room 101 Add $26,643 $26,643 <br />No. 2: Install one truck lift type 'B' in room 100 Add $120,766 $120,766 <br />No. 3: Install operable partition room 219 Add $12,020 $12,020 <br />No: 4: Painting of walls and ceilings/structure Room 300 <br />Main Garage Add . $33,742 $33,742 <br />No. 5: Canopy at fuel island. Add $29,351 Hold <br />No. 6: All demolition and renovation workshown in Tool <br />Room 401 Add $23,826 $7Q000 <br />No. 7~ All demolition and renovation work in rooms 405, <br />406, 407 and 408 Men/Women; Coats/Boots Add $43,461 Incl. in No. 6 '. <br />No. 8: All demolition and renovation work in room 409 <br />'Woodshop Add: $47,259 {nel. in No. 6 <br /> <br />~ <br />No. 9: Replace all type A, A1, A2 and A3 light fixtures with <br />type A4 and AS LED light fixtures -Add $14,553 $14,553 <br />. <br />No. 10: Base bid vehicle lifts by Rotary Lift. Add $2,505 Rejected <br />No. 11: Install one vehicle lift - type'1' Rotary in room 101 Add $15,431 Rejected <br />No. 12: install one truck lifttype'B' Rotary in room 100 Add $136,561 Rejected <br />No. 13: Fire Alarm System by Gamewell/FCI Deduct ($4,312) ($4,312) <br />Unit Price #1 Import Class 5 -..per cubic yard. Add $18 Accepted <br /> <br /> <br /> Total Construction Costsc $8,835,033 <br /> <br /> Owner Costs: $702,900 <br /> <br /> Total Project Costs: $9,537,933 <br />PAGE 1 OF 1 <br />