Laserfiche WebLink
ty of <br /> <br />MEMORANDUM <br /> <br />0 <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: Phil Hals, Street/Park Superintendent <br /> <br />DATE: <br /> <br />February 17, 1998 <br /> <br />SUBJECT: Staff Considerations for Soil <br /> Corrections in Lions Park <br /> <br />City Staff has concerns for the physical location of the building within <br />the park and would recommend against "land-locking" the building too <br />closely to the south or east property line. Soil corrections can still <br />proceed at this time with the final building location to be determined <br />closer to the time when construction actually starts. The building foot <br />print could be moved to the north (into the parking lot) or to the west <br />with no ill effects to the park. <br /> <br />It is prudent to move forward to take advantage of the winter season <br />for both the contractor doing the removals and the City Street/Park <br />Department who will be placing the fill material. <br /> <br />Ail city participation will stop in the event of a winter storm and will <br />not resume until normal snow removal is completed. <br /> <br />The city and contractor should abide by spring weight restrictions and <br />suspend operations during that time. <br /> <br />The city will replace fill dirt to the best of theft ability with city crews <br />and equipment. The city will not pay for additional support. <br /> <br />s:\council\lionsoil.doc <br /> <br />13065 Orono Parkway * P.O. Box 490 * Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 <br /> <br /> <br />