Laserfiche WebLink
Monthly User Charges <br /> <br />There is a monthly user charge for city sanitary sewer and water service. These <br />charges are based on water usage, and will vary according to how much water is <br />used each month. <br /> <br />E. Project Schedule <br /> <br />The following project schedule for the Boston Street Utility Improvements <br />project is based upon guidelines established in Minnesota State Statues, Chapter <br />429, Local Improvements, Special Assessments. These dates may be revised as <br />the project develops. <br /> <br />Receive Feasibility Study and <br /> Order Public Hearing <br /> <br />January26, 1998 <br /> <br />Hold Public Hearing and Order Plans <br /> and Specifications <br /> <br />March 2, 1998 <br /> <br />Approve Plans and Specifications and <br />Authorize Advertisement for Bids <br /> <br />March 23, 1998 <br /> <br />Receive Bids and Set Assessment Hearing <br /> <br />April20, 1998 <br /> <br />Hold Assessment Hearing and Award Contract <br /> <br />May 25, 1998 <br /> <br />Begin Construction <br /> <br />June 1998 <br /> <br />Complete Construction <br /> <br />August 1998 <br /> <br />V. CONCLUSION <br /> <br />The proposed project would improve the sanitary sewer and water services for the <br />properties within the project area by connecting them to the City systems. It would <br />also allow the cemetery to install an irrigation system for its property. The estimated <br />cost of the project is $ 58,600.00, with costs partially or wholly assessed to the affected <br />property owners. Based on the information gathered and the analyses presented, the <br />proposed improvements are feasible from an engineering standpoint. <br /> <br />FEAS-801.210 5 801210j <br /> <br /> <br />