My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 02-17-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
02/17/1998
>
4.4. SR 02-17-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:05 AM
Creation date
9/22/2003 9:08:51 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monthly User Charges <br /> <br />There is a monthly user charge for city sanitary sewer and water service. These <br />charges are based on water usage, and will vary according to how much water is <br />used each month. <br /> <br />E. Project Schedule <br /> <br />The following project schedule for the Boston Street Utility Improvements <br />project is based upon guidelines established in Minnesota State Statues, Chapter <br />429, Local Improvements, Special Assessments. These dates may be revised as <br />the project develops. <br /> <br />Receive Feasibility Study and <br /> Order Public Hearing <br /> <br />January26, 1998 <br /> <br />Hold Public Hearing and Order Plans <br /> and Specifications <br /> <br />March 2, 1998 <br /> <br />Approve Plans and Specifications and <br />Authorize Advertisement for Bids <br /> <br />March 23, 1998 <br /> <br />Receive Bids and Set Assessment Hearing <br /> <br />April20, 1998 <br /> <br />Hold Assessment Hearing and Award Contract <br /> <br />May 25, 1998 <br /> <br />Begin Construction <br /> <br />June 1998 <br /> <br />Complete Construction <br /> <br />August 1998 <br /> <br />V. CONCLUSION <br /> <br />The proposed project would improve the sanitary sewer and water services for the <br />properties within the project area by connecting them to the City systems. It would <br />also allow the cemetery to install an irrigation system for its property. The estimated <br />cost of the project is $ 58,600.00, with costs partially or wholly assessed to the affected <br />property owners. Based on the information gathered and the analyses presented, the <br />proposed improvements are feasible from an engineering standpoint. <br /> <br />FEAS-801.210 5 801210j <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.