Laserfiche WebLink
Memorandum <br />Date.: January 10, 2012 <br /> <br />To: Annie Deckert <br />City of Elk River <br />13065 Orono Parkway NW <br />Elk River, MN 55330 <br />From: Jason S. Hanlon, PE, SE <br />Re: Site Observations -Jan. 5, 2012 <br />7.24 Main St. <br />Elk River, MN <br />Project BL-11-06693 <br />hereby certify that this plan, specification or report <br />was prepared by me or under my direct supervision <br />and that I am a d ly licensed pro ssional engineer <br />under the he Stat ne a. <br />Jason S. Hanlon <br />Date: 1/10/12 <br />Minnesota Registration No. 41941 <br />This memo is in regards to the site visit that were completed by Jason Hanlon, of Braun Intertec, on <br />January 5, 2012 to observe the current conditions of the demolition and the existing, exposed conditions <br />of the east wall of the 724 Building. <br />The wall in question appears to be in relatively good condition with no significant signs of distress or <br />settlement. There are some areas where the mortar in the joints is lacking and could use some tuck- <br />pointing, but overall the condition of the wall is good and in our opinion does not require significant <br />structural repair. <br />The following items need to be addressed moving forward: <br />- It was determined that the foundation depth along this wall is only 22-inches below grade and will <br />require some additional frost protection since this wall is now exposed to external temperatures <br />on the east side. Braun Intertec provided a detail (S1, dated 1/9/12) for this condition for the City <br />to implement. <br />- The exterior face of the east wall needs to be weatherized. This wall has not experienced external <br />conditions in some time, or if at all, and needs to be updated to provide the appropriate <br />protection. This may include, but not limited to, water proofing of the exterior face through <br />possible exterior finishes (i.e., stucco), updating the flashing along the parapet and at the front and <br />rear corners of the building, and infill of bearing pockets and openings accordingly. <br />Braun Intertec is available to help with preparing corrective measure details for the conditions noted <br />above. Please contact us if the City would like additional assistance with this matter or need any other <br />evaluations completed. <br />Please let me know if you have any questions. <br />