My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DTSR AGENDA 01-23-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Downtown Task Force
>
DT Taskforce Packets
>
2012
>
01-23-2012
>
DTSR AGENDA 01-23-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 11:48:49 AM
Creation date
1/30/2012 12:37:59 PM
Metadata
Fields
Template:
City Government
type
DTAG
date
1/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the mission statement gives the Task Force members general instruction on "where" and <br />"how" to do an activity, and the vision is the "what", the "why" needs to be answered. <br />The problem statement answers the why. To develop a problem statement, members axe <br />asked to write a problem statement, prior to the meeting. At the meeting, the task force will <br />divide into smaller groups, and each group will form a recommended problem statement <br />from its members' previously written statements. With 4-5 problem statements, the whole <br />group will work to bring together the best ideas into one. <br />3. Break. Sandwiches and soft drinks will be provided, as will time fox a short break. This <br />will be taken approximately midway through the evening. <br />4. Items fox discussion. At the November meeting, members were asked to review the plan <br />as provided, and outline items they felt required additional discussion. A list of topics <br />received was sent out via email in December, and included here. <br />1. Revitalizing the core downtown area (details to be determined). <br />2. The "river trial". Is this a part of the plan? <br />3. Schedule (Is the length suggested by the draft schedule appropriate?) <br />4. Process. How do we incorporate community input? <br />5. Preserve older housing stock. Axe we doing that? <br />6. Preserve historic buildings (implementation priorities to include identification, programs, <br />resources available to property owners). <br />7. Jackson Ave changing land use to "medium density" on the East side. <br />8. Clarity on Hwy 10 fox access from the Hwy and access on city streets to downtown. <br />9. Bluff Block along Main St-the current new building and history and the established <br />business and history. <br />10. The building demolition on Main St. next to the ER Meats and the ER Meats area. <br />11. The 'future study area'. <br />12. Future transit ox train station locations. <br />13. Study area boundary, does it need to be expanded? <br />14. Study area boundary, does it need to be condensed. <br />15. Planning horizon. Currently 20 years. Should it be longer, shorter? <br />16. Jackson Avenue alignment, and its intersection with Highway 10. <br />17. Careful review of the alignment of streets north of 10. <br />18. Commercial uses along and south of Main, should there be a defined edge of <br />downtown? <br />19. Historic Preservation. <br />20. Mixed uses, a general evaluation of appropriate land uses. <br />21. Proximity of residential to the rerouted railroad. <br />22. Better understand issues with existing new projects, so that appropriate changes to our <br />plan can be made to reduce that risk. <br />From this list, the Task Force needs to collectively decide where this topic falls in relation to <br />the mission statement of the study, and if within the scope, is this topic critical to the <br />C:\Documents and Settings\chanson\Local Settings\Temporary Internet Files\ContrntOudook\OXQGOU3E\Memo 1-23-12 <br />meeting.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.