My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.4. SR 02-02-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
02/02/1998
>
3.4. SR 02-02-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:05 AM
Creation date
9/22/2003 8:31:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/2/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROGRAM <br /> <br />MONDAY, FEBRUARY 9 <br /> <br />A.M, <br />8:00 Registration <br /> Wisconsin Center Guest House <br /> 610 Langdon Street <br />8:30 Welcome & Introduction <br /> Philip M. Bennett <br /> Program Director <br />8:45 Discussion of <br /> Week's Activities <br /> · Presentations and <br /> Demonstrations <br /> · Problem-solving <br /> · Assignments <br />9:15 Codes Interpretation <br /> and Implementation <br /> · Standards vs. Codes <br /> · interpretation <br /> · Decision-making <br />10:00 Coffee and Conversation <br />10:30 Mechanical Codes <br /> · Introduction <br /> · Purpose and Scope <br /> · Code Arrangement <br /> · Referencing Content <br />11:15 Setting up a Mechanical <br /> Inspection Program <br />12:00 Lunch <br />P.M. <br />1:00 Mechanical Definitions <br />2:30 Symbols and Calculations <br /> · SMACNA, ASHRAE Symbols <br /> · Basic Calculations <br />3:00 Refreshments <br />3:20 Fundamental System <br /> Design <br /> · Basic Load Calculations <br /> (Manual J) <br /> · Establishing an Air Balance <br /> Schedule <br /> -Effects of Positive and <br /> Negative Pressure <br />5:15 Social Hour <br />6:15 Dinner <br /> Wisconsin Center Guest House <br /> <br />TUESDAY, FEBRUARY 10 <br /> <br />A.M. <br />8:30 <br /> <br />10:00 <br />10:30 <br /> <br />12:00 <br />P.M. <br />1:00 <br /> <br />2:45 <br />3:00 <br /> <br />4:30 <br /> <br />Heating and Cooling <br />Equipment <br />· Residential <br />· Commercial <br />Coffee and Conversation <br />Heating and Cooling <br />Equipment (continued) <br />· Plan Review <br />· Field Inspection <br />Lunch <br /> <br />Air Duct Systems <br />· Materials <br />· Supports <br />· Controls <br />· Protection of Fire Ratings <br /> - Fire Dampers <br /> - Firestopping <br />Refreshments <br />Air Duct Systems <br />(continued) <br />· Plan Review <br />· Field Inspection <br />Adjourn <br /> <br />WEDNESDAY, FEBRUARY 11 <br /> <br />A.M, <br />8:30 <br /> <br />10:00 <br />10:30 <br /> <br />Fuel Supply Systems <br />· Fuel Oil <br /> - Tank Installation <br /> -Piping (materials and <br /> methods) <br /> -Safety Precautions & Tests <br />· Fuel Gas (natural and LPG) <br /> -Tank Installation (LPG) <br /> -Piping (materials and <br /> methods) <br />Coffee and Conversation <br />Fuel Supply Systems <br />(continued) <br />· Fuel Oil <br />· Fuel Gas (natural and LPG) <br /> - Plan Review <br /> - Field Inspection <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.