My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 01-10-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2012
>
01-10-2012
>
6.1. ERMUSR 01-10-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 3:45:42 PM
Creation date
1/6/2012 3:43:59 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Irrigation System Assessment: (3 Water Conservation Points) <br />Name of Company Performing Assessment: <br />Technician Name: <br />Please provide an itemized copy of the original invoice with this form. <br />Phone Number <br />Assessment must include: Check all data sensors to ensure they are operational, program controller, inspect for leaks in heads and <br />distribution pipes, check for proper alignment of sprinkler heads <br />Landscaping: (8 Water Conservation Points) <br />Type of landscaping changes (circle al] that apply): Eco-Grass <br />Please Describe "Other' <br />Square Footage of Area: <br />Native/Prairie Grass Rain Gazden Black Dirt <br />Xeriscape Other <br />(area must be larger than Soo square feet to qualify) <br />Installation Person/Company: Phone: <br />Please provide an itemized copy of the original invoice and a simple sketch of work done with this form. <br />Water Conserving Indoor Equipment: (Water Conservation Points, See Below) <br />Type equipment installed (circle all that apply: Shower Head (t WCP) Toilets/Urinals (i WCP each) <br />Clothes Washer (z WCP) Dishwasher (z WCP) <br />Rock Gazden <br />Pre-Wash Dish Sprayer (t WCP) Faucet Aerators (t WCP all faucets) <br />(Requirements: Shower head t.S gpm or less, Toilets i.z8 gpf/Urinals o.S gpf, Clothes Washer s S.S Water Factor, <br />Dishwasher 4.zS gallons/cycle, pre-rinse Sprayer i.6 gpm, and Faucet Aerator < 2.~5 gpm) <br />Installation Date: (Copy of invoice with application required) <br />Type of Equipment Brand Name <br />t. <br />z. <br />3• <br />4• <br />5• <br />6. <br />7~ <br />MAIL TO: <br />Model No. WCPs <br />Elk River Municipal Utilities, C/O WATER CONSERVATION REBATE, P.O. Box 430, Elk River, MN 55330 <br />
The URL can be used to link to this page
Your browser does not support the video tag.