Laserfiche WebLink
ELK RIVER MUNICIPAL UTILITIES <br />Energy Management Rates <br />Elk River Municipal Utilities shall provide: <br />1. All electric energy consumed by this ETS system at $.042 per KWH. <br />2. This equipment will be energized only for 8 off peak hours daily. Additional on-time is <br />provided on weekend days and holidays. <br />3. A meter to measure electricity consumed by the ETS space heating system. <br />4. A load control device which will automatically control ETS space heating system during on- <br />peak hours. <br />Electric Thermal Storage IETSI Water Heating Rate: An ETS water heater is designed with <br />extra storage capacity to provide total domestic hot water needs from electricity consumed only <br />during eight off-peak hours daily. Off-peak hours typically occur between 11 PM and 7 AM. <br />Qualifying ETS configurations may be a large single tank, dual tanks plumbed in series, or an <br />electric and non-electric tank plumbed in series with the electric placed on the cold water side. 80 <br />gallons is the minimum storage capacity required. <br />To qualify for the special rate, the customer shall provide: <br />1. An ETS water heating system which can be interrupted directly by a single 30 amp rated <br />relay. <br />2. Obtain a load control device from ERMU. <br />3. Accommodations for a meter and load control device and associated wiring installed <br />according to the applicable electrical codes, and installed by a qualified electrician. <br />4. Inspection by a State certified electrical inspector and a representative of ERMU. <br />Elk River Municipal Utilities shall provide: <br />1. All electric energy consumed by the ETS water heater at $.042 per KWH. <br />2. This equipment will be energized o>~ for 8 off-peak hours daily. <br />3. A meter to measure electricity consumed by the ETS water heater. <br />4. A load control device and meter socket to accommodate the off-peak meter. <br />Cvcled Air Conditioning: This Program is available to all residential customers served by <br />ERMU who have central air conditioners. Program participants must allow installation of a utility <br />supplied load control device so air conditioning demand can be reduced at critical times. This <br />Program is subject to the following terms and conditions: <br />1. The Customer must have a conventional central air conditioner of at least 2 tons capable <br />of being interrupted with a 5 amp relay. <br />2. ERMU will furnish the load control device and pay to have it installed by a licensed <br />electrician. Separate metering is not required. <br />3. The Customer must allow access for installation of the load control device during normal <br />business hours. <br />4. The Customer must allow access for load control maintenance and compliance <br />inspections by ERMU personnel during normal business hours. <br />5. Customers must agree to allow ERMU or its designee to remotely cycle their central air <br />conditioner off for approximately 15 minutes out of each 30 minute period at critical peak <br />use times during the cooling season (May through September). Except for extreme <br />emergencies, duration of said control will not exceed 6 hours per day and more than 200 <br />hours total per cooling season. <br />