My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1 PCSR 1-10-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
01-10-2012
>
5.1 PCSR 1-10-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 12:13:19 PM
Creation date
1/5/2012 2:33:15 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iv Licensee shall advise the Citv Environmental Administrator, if requested, when these loads <br />are being inspected and the City shall have the right to have its personnel on-site to observe <br />the inspection process. <br />v City shall have the right to thoroughly inspect the Resource Processing Plant at any time <br />for cleanliness and compliance with the other terms of this License.' <br />vi To further ensure compliance with restrictions in this License, and in Chapter 58, Article <br />III of the City Code of Ordinances, on the handling and Rrocessing of hazardous and <br />dangerous wastes and to protect the public health safety and general welfare of the <br />citizens of Elk River the Citv shall have the right, upon thirty (301 davs notice to Licensee, <br />to have an inspector at the Resource Processing Plant twenty-four (24) hours a dav. These <br />inspectors shall have the right of access to all areas of the Resource Processin P~ lant, <br />twenty-four (24) hours a dav for the purposes of inspection to ensure compliance with all <br />of the terms and conditions of this License, the Permit for the facilityand Chapter 58, <br />Article III of the Citv Code. The on-site Citv inspector shall have the right at anv time to <br />take one or more of the following actions: <br />vii. Order a load of MSW inspected, pursuant to the procedures set forth above; <br />viii. Order the Resource Processing Plant shut down if necessary to bring it into compliance <br />with anv other term or condition of this License, the Permit for the Project, or Chapter 58, <br />Article III of the Ci Code. <br />Comment (A3]: R'ha i , i ° of notifications i, <br />the City really lool:in ; SaYr We could he <br />E calling daily to n. ~~ i iA prni that we have a lim <br />l,~r;~, Aud loot ~airp -= dxs the cleanline-< <br />iny~ction ,ors, ~I'1 ~,~ ~.ln has already state-I <br />LImL LheV Cau ::mnr t+nd in-~~°M nL any time, <br />and with notice.,~~.,nu ~ai~in~~datean <br />~ inspection during xu ou i ~ .. I Lrli~~~e #his <br />languageboberepetitn~~on,3~~n~~,_.r~,=an <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.