Laserfiche WebLink
~ ~ <br />Project <br />Total <br /> <br />ZTSM DER <br />Description <br />Qait <br />DNIT PRICB ESTIt91TED <br />QUASITZTY <br />E$TIMATBD C08T <br />2575.523 EROSION CONTROL BLANKETS CATEGORY 1 SQ YD $1.25 10911 .$13,013.89 <br />2575.532 FERTILIZER TYPE 2 POUND $1.00 430 5430.21 <br />2575.571 RAPID STABILIZATION METHOD 3 M GALLONS $260.00 12.9 $3,355.65 <br /> <br />2582.501 STRIPING LUMP SUM $10,000.00 1 $10,000.00 <br /> <br />Y SIIBTOTAL $1,708,012.82 <br />108 CONTSDIGENCY $170,801.28 <br />GSiT-OF-SPAY $8, 950.00 <br />LAtSD PERSIITTING $41, 000.00 <br />STRATIOti ~ BNGIII]ESRINO ~ LSr.GAL $469,703.53 <br />PROJECT TOTAL - $2,398,467.63 <br />Page 2 of 2 12/07/2011 <br />