My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7. EDSR 01-9-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2012
>
01-09-2012
>
7. EDSR 01-9-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2012 1:00:23 PM
Creation date
1/5/2012 12:59:22 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
1/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the lot is split, access (off of Twin Lakes Road, or a frontage road on the property) <br />sewer and water service will need to be made available to the remaining portion of <br />the parcel. <br />o From an engineering standpoint, City Engineer does not recommend an <br />access off of Twin Lakes Road. Access spacing guidelines identified in the <br />City of Elk River's transportation plan do not permit an access onto Twin <br />Lakes Road. The City Engineer has no problem with a frontage road on the <br />property to provide access to the remainder of the lot <br />• Based on the proposed addition, a storm sewer line that exists along the current <br />north property line will need to be relocated around the north side of the building. <br />• The proposed plan shows dock doors adjacent to a public street which would require <br />a conditional use permit and extensive screening. This typically takes about 6 weeks <br />from the date of complete application to City Council review <br />• The property is owned by the EDA, therefore, before the CUP application would be <br />considered complete, CDI must purchase the property or the EDA must provide <br />written support for the application/sign the application <br />Should the EDA choose to move forward with the sale of a portion of the lot, the costs <br />below should be discussed with the EDA and negotiated with the applicant: <br />^ Relocation of storm sewer line- $50,000 <br />^ Water Service- $3,900 <br />^ Sanitary Service - $12,000 <br />^ Turn Lane and entrance (off Twin Lakes Road)- $29,000 <br />^ Frontage road on property- $102,000 (approximately 450 ft. at <br />$267.00/ft.) <br />At their meeting on July 11`'' 2011, the EDA discussed their intentions with the lot in <br />question as it pertained to Spectrum Charter School's request to place a dome on a portion <br />of the lot. It was the consensus of the EDA that this lot was intended for industrial <br />development, higher design standards and that the dome would decrease visibility, therefore <br />bringing development down. Additionally, at their July 18`'', 2011 Council meeting, the City <br />Council expressed their desire to hold the lot for future industrial development and indicated <br />splitting the lot was not an option because of the lack of City owned property, with utility <br />access available for industrial development. <br />Staff is seeking direction on how to proceed. Options for consideration include: <br />Purchase lot at $2 sq/ft for a total of $773,625.60 (12.13 acre lot for net price of <br />$1.46 sq/ft) <br />Purchase lot at fair market value; may be determined by appraisal <br />• Lot split <br />P D M" E fl E 0 9 C <br />~~~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.