Laserfiche WebLink
Construction Services <br />The Engineer will provide the Construction Phase Basic Services as oulJined in this agreement on an hourly <br />basis in accordance with the General Engineering Fee Schedule attached plus reimbursable expenses. The <br />Engineer's fee for the Construction Phase is estimated as follows: <br /> <br />Package 1 - Ice Rink Floor Replacement <br />Package 2 - Dasher Board Replacement <br /> <br />$3000 to $4000 plus expenses (est. $200) <br />$1200 to $1800 plus expenses (est. $100) <br /> <br />Conditions beyond the control of the Engineer may cause fees to exceed this range. The level of service <br />provided by the Engineer will depend in part on unforeseen site conditions, the quality and responsiveness of <br />the Contractor and the Contractor's adherence to the construction schedule. <br /> <br />For pre-approved Supplemental Services the City will pay the Engineer on an hourly basis in accordance with <br />the General Engineering Fee Schedule plus reimbursable expenses. Basic services and reimbursable <br />expenses will be billed monthly. <br /> <br />The General Engineering Fee Schedule is valid through December 31, 2003. Any services furnished after <br />December 31, 2003 will be charged in accordance with our 2004 fee schedule. We will not increase any item <br />on the fee schedule by more than 5% for work performed in 2004. This fee increase does not affect the fixed <br />fee proposed above provided the design phase is completed in 2003. <br /> <br />Additional Terms and Conditions <br /> <br />If there are protracted delays for reasons beyond the Engineers control, the City will negotiate with the <br />Engineer an equitable adjustment to the Engineer's compensation taking into consideration the impact of such <br />delay. <br /> <br />If there are revisions to the design after the Engineer has started the work in accordance with the instructions <br />provided by the City, the Engineer will proceed with revisions to the work as extra work and will bill hourly in <br />accordance with the General Engineering Fee Schedule that is applicable to the period when services are <br />being rendered. <br /> <br />Prior to starting the work, the City shall provide the Engineer with full information regarding the City's <br />requirements including any special or extraordinary considerations for the Project or special services needed. <br />The City shall also make available all pertinent existing data. <br /> <br />Mr. Rich Czech <br />September 2, 2003 Page 4 of 5 <br /> <br /> <br />