My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4. SR 12-19-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
12-19-2011
>
8.4. SR 12-19-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2011 11:48:21 AM
Creation date
12/16/2011 11:48:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk River, Minnesota <br />Department Sewer Deparhnent <br />Contact Engineer <br />Priority n/a <br />Project # `7~7`7~7_26 <br />Project Name Effluent Reuse Project <br />Type Improvement <br />Useful Life Unassigned <br />Category Buildings <br />This project involves the study of reusing the effluent water from the City WWTF by Great River Energy in some of <br />their plant processes. The project costs include the preliminary engineering work and associated construction costs to <br />pump the water from our facility to Great River Energy. <br />Justification ~ <br />Zeuse by product which would other wise be a waste output from the WWTF <br />Expenditures 2012 2013 2014 2015 2016 Total <br />Construction/Maintenance 571,480 571,480 <br />Total 571,480 571,480 <br />Funding Sources 2012 2013 2014 2015 2016 Total <br />Sewer Fund 285,730 285,730 <br />State grants 285,750 285,750 <br />Total 571,480 <br />2012 rh,-u 2016 <br />571,480 <br />2012-2016 CAPITAL IMPROVEMENTPLAN Page 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.