Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2012 thru 2016 <br />Project # II-31 <br />Project Name Trail along Business Center Drive <br />Type Unassigned Department Infrastructure Improvements <br />Useful Life 15 years Contact Engineer <br />Category Traillmprovements Priority n/a <br />Construct the missing pieces of traiUsidewalk along Business Center Drive between Joplin Street and Orono Park. <br />When the YMCA was built a sidewalk was constructed along the north side of Business Center Drive along the YMCA <br />parking lot. This project will connect the newly installed piece of walk with the existing trail and sidewalk network at <br />Joplin Street on the west and Orono Park on the east. <br />Justification <br />This traiUsidewalk connection will provide safe connectivity of our existing off street trail system in the area. <br />Expenditures 2012 2013 2014 2015 2016 Total <br />Construction/Maintenance 100,000 100,000 <br />Total <br />Funding Sources 100,000 <br />2012 2013 100,000 <br />2014 2015 2016 Total <br />Street Improvement Reserve 100,000 100,000 <br />Total 700,000 100,000 <br />2012-2016 CAPITAL IMPROVEMENT PLAN Page 17 <br />