Laserfiche WebLink
I • ~ ~ <br />~ ~ ~ ~ / ~ / / ~ <br />~ <br /> <br />Project <br />Total <br />ITEM NUMBER Description Unit UNIT PRICE ESTIMATED <br />QUANTITY ESTIMATED COST <br />2575.523 EROSION CONTROL BLANKETS CATEGORY 1 SQ YD $1.25 10411 $13,013.89 <br />2575.532 FERTILIZER TYPE 2 POUND $1.00 430 $430.21 <br />2575.571 RAPID STABILIZATION METHOD 3 M GALLONS $260.00 12.9 $3,355.65 <br /> <br />2582.501 STRIPING LUMP SUM $10,000.00 1 $10,000.00 <br /> <br />OADWAY SIIBTOTAL $1,708,012.82 <br />108 CONTINGENCY $170,801.28 <br />GHT-OF-WAY $8,950.00 <br />TLAND PERMITTING $41,000.00 <br />MINISTRATION / ENGINEERING / LEGAL $469,703.53 <br />PROJECT TOTAL $2,398,467.63 <br />Page 2 of 2 12/07/2011 <br />