My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. SR 01-26-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
01/26/1998
>
4.0. SR 01-26-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:04 AM
Creation date
9/8/2003 8:25:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIP Memo <br />January 26, 1998 <br /> <br />With Area C there has been a lot of general discussion about funding <br />shortfalls. I need to provide the Council with more details as to what parts of <br />the project are short (i.e. streets, surface water management, trunk utilities, <br />etc.), and some of the possible funding sources to address these shortfalls. <br />There are a tremendous amount of variables in this project and these <br />variables relate to what outside funding sources could be available, when we <br />will know if these funding sources are available, and when the "total" project <br />will or must be accomplished. By total project I mean it may be possible to <br />initially construct the street corridor as a two lane road versus the ultimate <br />design of a four lane road. Also, not all of the surface water management <br />(SWM) facilities need to be installed at once, but some pipes and ponds can <br />be installed as development and the associated water runoff dictates. As you <br />can tell, the Area C project is complex and I need to spend some time with <br />the Council to start discussing some of the details and options and potential <br />worse case scenarios so that everyone is walking into this project with their <br />eyes open. <br /> <br />Please take the time and review the attached material relating to the east <br />Elk River project. This material includes the 1/5/98 CIP section of the City <br />Council minutes, the financial parts of the 7/19/97 east Elk River feasibility <br />study, and the maps of Area A and C, along with the assessment map. <br /> <br />Following the presentation and discussion with the Council on the east Elk <br />River project, I expect that the city engineer and I will need another 30-45 <br />minutes to review which 1997 projects need to be finalized this year and to <br />review the current status of the projects that are planned for 1998. This <br />discussion will relate almost exclusively to public improvements and streets. <br />Please see the attached material for a review of the current status of projects <br />and the plans for 1998 projects. <br /> <br />Included in the street and public improvement discussion with the Council is <br />the need to discuss the attached Boston Street feasibility study and project <br />and the Jarvis Street feasibility study and project. City Council discussion is <br />also needed on the overall city-wide pavement management program and <br />how this long term, phase by phase, project can be financed. <br /> <br />Following the east Elk River discussion and the current status of public <br />improvement projects discussion, I need some time with the Council to <br />discuss a variety of very important miscellaneous issues that are anticipated <br />in the near future. These projects include, but are not limited to, the topics <br />on the following page: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.