My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10. SR 12-05-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
12-05-2011
>
4.10. SR 12-05-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2011 10:23:57 AM
Creation date
12/2/2011 10:23:56 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br />October 24, 2011 <br />Page 2 <br />5. Complete an underwater inspection of the upstream and downstream sides of the <br />spillway. This inspection will include the concrete structures, gates and other accessible <br />sections of the dam components. The dive will be completed using surface supplied air <br />and underwater communications. We do not plan to video tape the inspection; however <br />if we find significant deficiencies, we will video tape the condition. We will have a <br />backup diver available and ready to enter the water in the event of an emergency. <br />6. Prepare and submit to the City a summary report of the findings, cost estimates and <br />underwater inspection. <br />7. Review the existing Inspection, Operation and Maintenance Plan (IOMP) for the dam. <br />We will provide comments pertaining to required updates and recommendations for <br />adequacy of plan and/or additional recommendations for inspection and operation <br />activities. <br />Responsibilities of Owner and Others <br />Owner will provide access to available files for the dam and access to the site. <br />Additional Services <br />Additional services may include structural computations, dam hazard rating and inundation <br />mapping or detailed structural inspection of gates. If additional services are needed we will <br />provide a scope and fee estimate to the Owner for this work. <br />Time Schedule <br />We will complete this work within 90 days of receipt of notice to proceed. <br />Fee <br />We will perform the above services for a lump sum amount of $11,900. The fee breakdown is <br />as follows: <br />Inspection and Report $3,500 <br />Underwater Inspection and Report $8,200 <br />Review of IOMP $200 <br />Contract Terms and Conditions <br />Attached are "Contract Terms and Conditions" which will apply to the services and which are <br />incorporated into this proposal by reference. <br />Acceptance <br />If this proposal and terms and conditions are acceptable to you, a signature on the enclosed <br />copy of this letter will serve as our authorization to proceed. We can also proceed on this work <br />with a purchase order issued by the City. <br />This proposal is valid until December 15, 2011 unless extended by us in writing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.