My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 11-21-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
11-21-2011
>
4.4. SR 11-21-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2011 2:05:53 PM
Creation date
11/18/2011 2:05:52 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 8, 2011 <br />Page 5 of 5 <br />Response to Comment #5 -Comment noted. No additional response required. <br />Comment #6: All utilities that parallel or cross TH 10 will require a Long Form Permit. An <br />access permit will be issued for construction only. Any other work that impacts Mn/DOT R/W <br />will require other permits. For information about the required permits, please contact E. Buck <br />Craig MnDOT Metro Roadway Regulation Supervisor, Office 651-243-7911, Ce11651-775-0405 <br />or buck.craig state.mn.us. <br />Response to Comment #6 -This permit has been added to Item 8 -Permits in the <br />Final AUAR. <br />Comment #7: The City of Elk River has coordinated with MnDOT District 3 with regard to the <br />traffic impacts to TH 10 in the AUAR vicinity. District 3 has agreed to the concepts illustrated <br />in the AUAR. However, no commitment has been made by District 3 with regard to funding at <br />this point. When the City is ready to construct the TH 10/Twin Lakes Parkway intersection, <br />MnDOT and the City will need to discuss the required TH 10 access revisions to allow for a <br />new intersection to be opened on TH 10. <br />Response to Comment #7 -Comment noted. No additional response required. <br />Comment #8: Page 3 and 4 -Water Supply and Wastewater/Sanitary Sewer (Also Page <br />8 -Municipal Water Use and Service): Since this area of TH 10 is planned for a future <br />freeway, new water main and sanitary sewer should be placed outside of MnDOT right of way. <br />Conversion of TH 10 to a freeway at a later date will require the City to relocate the utility <br />lines if they are placed in the TH 10 right of way at this time. <br />Response to Comment #8 -Any new sanitary sewer or watermain will be placed <br />outside of MnDOT right of way. When these utilities are extended, future right of way <br />needs will be taken into consideration. The City understands that it will be their <br />responsibility to relocate these utilities if they are in conflict with future TH 10 plans. <br />Comment #9: Page 6, third paragraph (Also Page 11, G-6): Construction of TH 10 as a six <br />lane does not appear justified based upon the limited life span of the six lane section prior to <br />the interchange being needed. The fact that the six lane does not appear cost effective should <br />be noted. <br />Response to Comment #9 -Comment noted. Reference to the six lane segment will be <br />removed in the Final AUAR. <br />Comment #10: Page 11, G-3: The proposed signal would be allowed to go in at Twin Lakes <br />Parkway when traffic warrants are met. <br />Response to Comment #10 - It is anticipated that the need for the additional <br />intersection and signal at Twin Lakes Parkway will be driven by the development of <br />Minneapolis ^ St. Cloud <br />Equal Opportunity Employer <br />N: (Public BodieslCity CouncillCoancil RCAIAgenda PacketV 1-21-201 / (Comment Responses.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.