Laserfiche WebLink
Benefits <br />Insurance, vacation, holidays, and other benefds also aze part of the complete compensation package. <br />It was discussed in the Committee meeting that E1tMiJ has an excellent health insurance plan with a <br />generous employer contribution. One of the other similar municipal utilities in the survey does have <br />the exact same health insurance plan with a similar employer contribution; the others have HSAs or <br />high deductible insurance plans. In 2010, staff conducted an extensive analysis of the metro-average <br />survey utilities' of their benefits which including health insurance. This analysis was reviewed by the <br />committee. For 2012, ERMU's health insurance plan renewal will recognize a 9.5% decrease in <br />rates, or an approximate overall savings of $50,000. <br />The Dental, Long Term Disability (LTD), and Life Insurance were also discussed because ERMLJ <br />received notice of the substantial increase in the renewal rates approximating an overall increase of <br />$10,000. An effort in negotiating these increases downward by our insurance broker was <br />unsuccessful. We are currently out for bids on these insurance items. <br />At the October Commission meeting, a presentation on Long Term Care was made. This insurance <br />option was further discussed at the Committee meeting. Specific pricing was not yet made available <br />and thus this topic needed further review. <br />Other <br />There were a number of items brought to the committee by the employees for committee <br />consideration. There were also additional items identified for research by the committee. Some of <br />these items were: <br />Employees requested the Committee look into uniform laundry services. Preliminary numbers <br />indicated there may be savings to the Utilities through a laundry service with uniform rental. There <br />may be issues with the calorie ratings and uniform choices. The Committee is currently looking into <br />the viability of this option. <br />Employees also requested the Committee look into the On-Call Holiday Compensation, specifically, <br />look at adding a compensatory day as compensation for being on-call over a holiday. This would be <br />similaz to some other utilities. The Committee is currently reviewing this request. <br />The Committee also discussed Utility rankings, budgeted margins, cost of turnover, the future of the <br />metro-average survey, and potential 2012 purchase power increase. <br />At the Commission request, additional detail from the Committee meeting discussion topics can be <br />provided. The next scheduled meet for the Committee is November 30. At this meeting the Committee <br />will review the data collected and decide on options to present to the Commission for a decision during <br />the December Utilities Commission Meeting. <br />ACTION REQUESTED: <br />No Action is required at this time. <br />