Laserfiche WebLink
K. Miscellaneous <br />• The site will require a NPDES permit and a Storm Water Pollution Prevention Plan <br />(SWPPP). The SWPPP must be in an 8 lh" x 11" format and signed by the owner, <br />engineer and contractor. <br />• .The SWPPP must address temporary sedimentation ponding during construction. <br />If you have any questions regarding these issues, please call. <br />Sincerely, <br />Terry J~FGlaurer, PE <br />City Engineer <br />S;\PLANNING\Case Files\2006\Plat\P 06-06 Jabez\04 03 06 engr memo.doc <br />