My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 11-58
ElkRiver
>
City Government
>
City Council
>
Council Resolutions
>
2010 - 2019
>
2011
>
RES 50-74
>
RES 11-58
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2011 10:34:49 AM
Creation date
9/22/2011 3:52:05 PM
Metadata
Fields
Template:
City Government
type
RES
date
9/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the monitoring event. All gas probe monitoring data must be <br />fully evaluated in the annual operating report. <br />(e) The current air monitoring for landfill gas emissions field survey is <br />only conducted for the topslope area and accounts for roughly 20 <br />percent of the fill azea. There is a higher likelihood that emissions <br />will occur on the sideslope based on the horizontal stratification of <br />the waste and preferred movement of landfill gas. ERL must <br />submit a modified Ambient Air Monitoring Plan to include <br />sideslope and topslope azeas that can be safely traversed at the time <br />of the monitoring event. <br />If concentrations exceed 500 ppm explosive gas (calibrated to <br />methane), corrective actions are required to amend the landfill <br />cover to mitigate fugitive emissions. This requirement is important <br />in identifying fugitive gas emissions/odors and ensuring that site <br />conditions are corrected to mitigate their effects. <br />(06) Phase IV Water Quality Monitoring Work Plan. The Phase IV Water <br />Quality Monitoring Work Plan which describes the sampling frequency, <br />pazameters, protocols and reporting frequency for landfill gas, leachate, leachate <br />piezometers, leachate lysimeters, residential wells, groundwater monitoring wells <br />and surface water shall be assessed annually to reflect changes in the monitoring <br />systems. The Work Plan shall yield adequate information for assessing the <br />effectiveness of the landfill gas control system in decreasing V OC contaminants <br />in the groundwater. <br />(07) Annual O eratin Re ort. An Annual Operating Report shall be submitted <br />with the following supplemental items. <br />(a) Annual Waste Disposal Volume. <br />(b) Schedule of construction activities for the forthcoming year. <br />(c) Type andQuantity f Material Disposed. <br />(d) Remaining permitted capacity <br />(e) Updated, full-size, contour map which indicates the elevations of <br />all fill areas <br />(f) Assessment of the Financial Assurances Plan. <br />(g) Evaluation of the Water Monitoring System and a proposal for <br />continued sampling and analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.