My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 09-19-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
09-19-2011
>
8.2. SR 09-19-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2011 9:13:14 AM
Creation date
9/16/2011 9:13:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINNESOTA POLLUTION CONTROL AGENCY <br />WATER QUALITY POINT SOURCE PROGRAM <br />Compliance Evaluation Inspection Report. <br />FACILITY INFORMATION: <br />Facility Name: Elk River WWTP <br />Permit Number: MN0020788 <br />Address: 248 Railroad Drive, Elk River, MN 55330 <br />Permit Expiration Date: November 30, 2012 <br />Facility Design Flow: 2.2 mgd (AWW) <br />Major Minor Classification: Major <br />Type of Flow: Domestic <br />Plant Class: B <br />Land Application Type: Type IV <br />24 Hour Contact: Mr. Gary D Leirmoe, Chief Operator <br />Phone: 763-635-1171 <br />GEOGRAPHIC INFORMATION: <br />MPCA Region: North Central <br />County: Sherburne <br />Basin: Upper Mississippi River, Upper Portion <br />Major Watershed: Mississippi River-St. Cloud <br />Receiving Water: Mississippi River (1C, 2Bd, 36, 3C, 4A, 46, 5, 6] [ORV1N] <br />THOSE PRESENT DURING THE INSPECTION: <br />Facility Representatives Title <br />Gary Leirmoe Wastewater Operator <br />Justin Femrite City Engineer <br />MPCA Representatives Title <br />Herschel Biasing Pollution Control Specialist Senior <br />INSPECTION INFORMATION: <br />Inspection Date: August 10, 2011 <br />Inspection Type: CEI, Domestic Municipal without Sampling <br />Inspection Category: State <br />FACILITY COMPONENTS: <br />Collection with gravity and/or Pressure Sewer <br />2 Bar Screen -mechanical <br />Influent Flow Meter <br />1 Grit Removal <br />2 Primary Clarifier <br />2 Trickling Filter <br />1 Activated Sludge -contact stabilization, conventional, step feed <br />Phosphorus Removal -chemical <br />3 Secondary Clarifier <br />Filter -sand with backwash (Proposed) <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.