Laserfiche WebLink
C. The Work includes the furnishing of all labor, equipment, tools, machinery, materials, and <br />other items required for the complete construction of the Work as specified. Equipment <br />furnished shall be in safe operating condition and of adequate size, capacity, and condition <br />for the performance of the Work. CONTRACTOR shall obtain all measurements necessary <br />for the Work and shall be responsible for establishing all dimensions, levels, and layout of the <br />Work. <br />D. CONTRACTOR shall be solely responsible for the coordination of its .activities with regard <br />to the work and the activities of Subcontractors and CITY. <br />1.05 PURPOSELY LEFT BLANK <br />1.06 WORK BY CONTRACTOR <br />A. CONTRACTOR shall obtain all permits or authorizations that may be required to perform the <br />Work including, but not limited to: <br />1. Asbestos notification prior to asbestos abatement <br />2. Other permits as necessary to complete the Work but not listed above. <br />1.07 CITY-FURNISHED PRODUCTS <br />A. None. <br />1.08 CONTRACTOR USE OF PREMISES <br />A. All CONTRACTOR activities shall be confined to work zones that shall be designated <br />around the areas of work shown on the Drawings and approved by CITY. CITY will indicate <br />at the preconstruction meeting, areas for staging materials and equipment and setting <br />decontamination zones. If additional area is needed it shall be the CONTRACTOR'S <br />responsibility to obtain access to such area. All material and equipment staging shall be <br />confined to areas within the property boundaries. The parking of equipment, materials, and <br />vehicles (either CONTRACTOR's or CONTRACTOR's employees or subcontractors) on <br />public roads will not be allowed. All material and equipment staging shall be confined to <br />areas other than public access roads within the construction limits. <br />B. The CONTRACTOR'S hours of operation shall be confined to between 7:00 a.m. and <br />7:00 p.m. (local time) on weekdays. These hours may be expanded only with. approval of <br />CTTY or OWNER. This includes starting and operation of machinery; delivery of equipment, <br />materials and machinery to the property; construction activity and any other activity which, in <br />the opinion of CITY or OWNER, may be disruptive to the surrounding community. <br />C. Protection and Repair of Existing Facilities an <br />operations carefully and in such a manner as t <br />Facilities, and Utilities. Obstructions not shown <br />exposed by CONTRACTOR without damage. <br />damage to existing structures, Underground <br />CONTRACTOR'S operations, .and shall repair <br />satisfaction. <br />01770-1 <br />d Utilities: CONTRACTOR shall perform <br />o protect existing structures, Underground <br />on the Drawings may exist and shall be <br />CONTRACTOR shall be responsible for <br />Facilities, and Utilities resulting from <br />or replace damaged items to OWNER's <br />C:\Users\jbarnhart\AppDataU.ocal\Microsoft\Windows\Temporary Internet Files\Content.0utlook\CIP8X2PD\Eagles demo.doc <br />