Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />Scenario 3 <br />Based on the analysis of future traffic volumes for Scenario 3 adding a third lane on <br />TH 10 / 169 could delay the need for an interchange by approximately four years. <br />TH 10 ,/ 169 Interchange - The fi,1_l b>>i1_d conditions were analyzed assuming a <br />standard diamond interchange at TH 10 / 169 and Twin Lakes Parkway with the <br />future roadway network shown in Figure 21- 4, and assuming full build of the <br />development area. The results of the analysis indicate that with the standard <br />diamond interchange the amount of traffic turning at the interchange ramps is <br />extremely high and cannot be accommodated with this type of interchange. The <br />overall LOS at both ramp intersections is LOS F in both the AM and PM peak hours. <br />Assuming an interchange with additional capacity such as a single point or diverging <br />diamond, the overall LOS could be improved to an overall LOS E with some <br />movements still at LOS F. <br />Twin Lakes Parkway at 168th Avenue -This intersection would experience delays <br />for both the northbound and westbound approaches during AM and PM peak hours. <br />The overall LOS at this intersection is projected to be F during both the AM and PM <br />' peak hours. If a roundabout or traffic signal is installed the operations would <br />improve to an LOS C. <br />~, Twin Lakes Parkway at Wilson Street -This intersection is located on the south side <br /> of TH 10 / 169. The delays at this intersection are strictly the result of the <br /> interchange operation and would be eliminated with a higher capacity interchange. <br /> St <br /> Twin Lakes Parkway at 171 <br />Lane -The eastbound and westbound minor street <br /> approaches will experience some delays during the PM peak hour. However, the <br /> overall intersection LOS is still at a B. <br /> All other study area intersections would be operating at LOS C or better during both <br />' the AM and PM peak hours. Table 21- 23 shows the results of the Full Development <br /> / Scenario 3 analysis. <br /> <br /> <br />n <br /> <br /> <br /> <br />' City of Elk River <br />Draft Alternative Urban Areawide Review <br />August 2011 <br />Page 74 of 90 <br />