Laserfiche WebLink
7. PROJECT MAGNITUDE <br />Table 7-1 summarizes the proposed land uses for each scenario based on the <br />scenario descriptions in Item 6. <br />Table 7-1 Proposed Land Use by Scenario (in acresl <br /> <br />f0 <br />' <br />y~ f0 <br />' ~ <br />L ~ <br /> <br />• ~ 3 <br /> ++ <br />C C <br />++ <br />G! C 3 L <br />~ i i <br />~ c0 <br />~ O. <br />H O <br />~ <br /> <br />~ C <br />s 'Q <br />u ~ <br />~ , <br />_ ~ <br />~ <br />ei J <br />F- <br /> <br /> <br />~ ~ ~ <br /> <br />_ ~ <br /> <br />a ~ <br /> <br />~ ~ <br />00 <br />~ ~ Q. <br /> <br />o <br /> <br />~ <br /> <br />o <br /> <br />Scenario 1 8 ac 0 ac 75 ac 64 ac 82 ac 14 ac 10 ac 253 ac <br />Scenario 2 0 ac 46 ac 0 ac 76 ac 116 ac 5 ac 10 ac 253 ac <br />Scenario 3 0 ac 46 ac 0 ac 76 ac 116 ac 5 ac 10 ac 253 ac <br />Most building heights would range from 1-2 stories in Scenario 1. For Scenarios 2 <br />' and 3, building heights would range from 3-4 story buildings (High Density <br />Residential); 1-3 story buildings (Job Area); 2-5 story buildings (Transit Center). <br />8. PERMITS AND APPROVALS. List all known local, state and federal permits, <br />approvals and financial assistance for the project. Include modifications of <br />any existing permits, governmental review of plans, and all direct and indirect <br />forms of public financial assistance including bond guarantees, Tax Increment <br />Financing and infrastructure. <br />Federal Permit/Approval <br />US Army Corps of Engineers Wetland Permit <br />State Permit/Approval <br />Pollution Control Agency NPDES Storm Water Permit <br />Pollution Control Agency Sanitary Sewer Permit <br />Department of Natural Resources Temporary dewatering for construction <br />Department of Health Water main <br />Mn/DOT Drainage permit, if needed <br />Mn/DOT TH 10 corridor plan approval and access <br />a royal <br />Mn/DOT /FHWA Interchange Access approval <br />Regional/ County/ Local Permit/Approval <br />City Comprehensive Plan amendment, if <br />Scenarios 2 or 3 are ro osed <br />City WCA Approval <br />City Preliminary plat approvals <br />City of Elk River <br />Draft Alternative Urban Areawide Review <br />August 2011 <br />Page 23 of 90 <br />