My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. SR 08-15-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
08-15-2011
>
5.7. SR 08-15-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 2:28:38 PM
Creation date
8/12/2011 2:04:46 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~.. <br />REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Plannui Commission 5.5 <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Plannin Items Au st 9, 2011 Chris Leeseber ,Park Planner-Planner <br />ITEM ©ESCRIPTION REVIEWED By <br />Request by Citc of Elk River for Conditional Use Permit for erem Barnhart, Plannin Mana er <br />Public Works Facility, REVIEWED BY <br />Public Hearing -Case No. CU 11-14 <br />ACTION REQUESTED <br />Staff recommends that the Planning Commission recommend approval of the Conditional Use Permit <br />(CUP) request with the following conditions: _ <br />1. Alighting plan will need to be provided showing that a level of 1.5 footcandles is <br />maintained. ., <br />2. A landscape plan will need to be approved by staff: <br />3. A sign permit will be required for all exterior signage. <br />.BACKGROUND/DISCUSSION <br />Early in 2010, the City of Elk River hired an architectural firm to complete a master plan for their public <br />works facility expansion. Later the same year, the city then hired 292 Design Group to complete the <br />architectural, civil, and engineering components of the expansion. <br />QVERVIEW <br />The subject property is about 27-acres in size and is zoned I1 (Light Industrial) where Government Buildings <br />and Facilities require a CU-P. The property is west of the intersection of County Road 1 and Proctor <br />Avenue. <br />Timing <br />Phase I (late fall 20 ~ ~~: <br />1. Relocate the fueling station <br />x 2. Relocate the salt shed <br />3. Relocate the compost area <br />4. Relocate the oil drop off station <br />Phase II: <br />1. Build an approximately 65,000-square footage addition onto the existing 18,400-square foot <br />building. <br />The city is requesting the CUP now which would authorize Phase I to occur this fall, with bidding to take <br />place for Phase II this winter. ` <br />N:\Departments\Communiry Development\Planning\Case Files\CUP\CU 11-14 ER Public Works\CU 11-14_PC.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.