Laserfiche WebLink
Page 5 <br />.~?~7~~ <br />(1"t~ 11s..ining activities shall not cause excessive vibration off site. If <br />excessive vibration becomes an issue, the City reserves the right <br />to take appropriate measures to alleviate the problem. <br />{1S} Groundwatex protection measures shall, include: <br />a. The operator shall ~.le with the City an emergency spill - <br />xesgonse plan. The operator shall adhere to this plan in <br />the event there is a spill. , <br />b_ The operator shall provide the Fixe Departanent with a <br />copy of their flammable or hazardous materials. <br />c. Fuel tanks shall be above ground, properly diked {if <br />required by Iaw}, and registered with ?1~PCg.. <br />d. Alt incidences that have the potential to adversely affect <br />groundwater, including but not limited to spills, shall be <br />verbally xeported to the City within 24 hours. This verbal <br />notification shall. be followed up in writing within ~ <br />worltiing days. <br />e. Czzavel wash: operations shall be prohibited on the <br />property. <br />£ Mining ogerations shall be conducted a ~+~n;mtsm of eve <br />(~) feet above the seasonally high water table_ <br />g. The appropriate storm water permit shall be obtained by <br />the operator from MPCA. <br />{19} Fencis3~ -The entire perixneter of the property shall. be fenced. <br />(20) ~creenina and l3ufferin~ - No mining operations sball be <br />conducted within two hundred (200} feet of the property boundax5=. <br />Further, within this two hundred (200) foot buffer area trees shalt be <br />left fox screening. In open areas where trees do not exist, screening <br />shall be accoxxiplished by the construction of a m~n~mum sip {6) foot <br />high berm planted with evergreens. <br />4.} Generat l'rovisi s- <br />(O1) Per~#,~- Operator agrees to comply vrith all of the provisions ~-l <br />hereof and agrees to save and hold the City harmless from any and all <br />cupsT-Ba16~Jsr <br />