My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 08-15-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
08-15-2011
>
5.6. SR 08-15-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 2:19:06 PM
Creation date
8/12/2011 11:46:57 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File: CU 11-13 <br />Page 2 <br />Tiller Corp. <br />Mining of the Landfill property is conducted in connection with Elk River Landfill, Inc. (ERL) <br />landfilling activities. As ERL needs to expand into a new cell, Tiller mines the cell removing the <br />gravel so that liners can be installed and the cell filled with solid waste. <br />Elk River Landfill, Inc. and Tiller Corporation filed separate applications to amend their existing <br />CUP's to allow expansion of mining and landfilling activities within the 200-foot buffer zone on the <br />southern boundary of the Landfill property. <br />Tiller's request is to amend Condition No. 3(20) of its 1996 CUP to allow removal of trees and <br />mining within the buffer area that is within 200 feet of the Landfill's south property line. The <br />material from the buffer zone will be used to construct the berm along the west side of Tiller's <br />entrance along 2215`. Please see the attached map. The berm will be vegetated this fall. <br />The Landfill has applied fox an amendment to their CUP to expand the landfill into the buffer area <br />and south into Tiller's property. Their application is currently scheduled to be reviewed at the <br />September 13, 2011 Planning Commission meeting. <br />If the Landfill CUP application is approved, Tiller will continue to mine the remaining buffer zone <br />to allow for the expansion of the landfill. Within six months of an approval for the Landfill <br />expansion, Tiller will amend their existing CUP for their gravel operation and hot mix asphalt plant <br />to include a revised phasing plan, bermuig and screen plan for the West side of the property along <br />2215` Ave and reclamation plan. <br />Planning Commission <br />No comments were received at the public hearing. <br />The Planning Commission recommended approval of the request with a 6-0 vote. <br />Attachments <br />Proposed 2011 Amended CUP <br />Planning Commission packet dated August 9, 2011 <br />C:\Users\jjohnson\Appllata\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlook\SFWAYSNS\CU 11-13_CC.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.