Laserfiche WebLink
$3,268.88 for running the URGE tests, for a total payment from GRE to ERMU of <br />$355,708.88. <br />In addition to being a financial benefit to ERMU, the diesels are part of a plan to provide <br />power to critical parts of the ERMU load, should an outage on the interconnection <br />occur. Although the diesels can carry only a portion of the current peak demand of <br />53,000 KW, they can provide electrical service to crucial loads, which can be isolated to <br />the diesels. <br />8 <br />