My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 08-09-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
08-09-2011
>
5.2. ERMUSR 08-09-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2011 4:11:48 PM
Creation date
8/5/2011 4:10:58 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) 50 hours/year for non-emergencies, but the 50 hours cannot generate income, <br />and the 50 hours must count towards the above 100 hours; or <br />(d) a maximum of 15 hours per year, which would count towards the above 100 <br />hours, as part of an Emergency Demand Response EDR) program. <br />This would be in a situation such as when a grid failure was imminent, but had not yet <br />occurred. ERMU could not continue its present programs of credits on wholesale power <br />purchases, under the proposed regulations. The IAMU, MMUA, and CMMPA have asked <br />that the 15 hours be increased to 100 hours, which would be a three-year rolling <br />average, and which would be beyond the 100 hours for readiness testing, including the <br />right for municipals to negotiate with their power suppliers for financial accreditation, <br />for these emergency units. If EPA agrees to the revised 100 hours, or even to 60 hours, <br />then ERMU could continue to receive capacity credits without installing emissions <br />controls. <br />If the unit is to be used for its present operation then, under the presently proposed <br />rules, the engine must be tested for emissions levels. The system must be retrofitted <br />with a Direct Oxidation Catalyst (DOC) silencer, which can be installed in place of the <br />existing exhaust silencer, or must re-use the existing exhaust silencer with an in-line <br />DOC. The new system must include installation of a closed crankcase ventilation <br />system, or a filtered open crankcase ventilation system, to prevent or diminish oil mist <br />in the atmosphere. <br />An emissions monitoring system must be installed, and emissions records must be kept <br />at the job site. An approved maintenance system must be implemented for each new <br />system. Approved low sulfur fuel oil must be used in the retrofitted engine. <br />After the conversions are completed, testing needs to be done to assure that CO <br />emissions are reduced by 70°~, or the CO level is reduced to 23 ppmvd (parts per million <br />
The URL can be used to link to this page
Your browser does not support the video tag.